Analysis of construction sub-processes for the evaluation of the real performance of tower cranes

Loading...
Thumbnail Image
Date
2021-08-30
ORCID
Advisor
Referee
Mark
Journal Title
Journal ISSN
Volume Title
Publisher
IOP Publishing
Altmetrics
Abstract
The productivity of work performed at construction sites is primarily dependent on the effective deployment and use of construction machinery. Nevertheless, manufacturers do not state the actual performance of their machinery because it is difficult to determine due to its dependence on the specific conditions present at each construction site. One of the most important machines used in the construction of buildings is the tower crane, which provides secondary transport of material onsite. In order to evaluate the effectiveness of the use of such machines using a deterministic or stochastic approach, a relatively extensive and exact set of data describing the activities of a given tower crane needs to be prepared. These data describe the real requirements of ongoing construction sub-processes with regard to the utilisation of tower cranes. This contribution concerns the analysis of key construction sub-processes during the building of monolithic reinforced concrete structures in connection with secondary transport at the construction site; in particular, it describes the preparation and processing of this data for the evaluation of real time requirements placed on tower cranes.
Description
Citation
IOP Conference Series: Materials Science and Engineering. 2021, vol. 1203, issue 1, p. 1-14.
https://iopscience.iop.org/article/10.1088/1757-899X/1203/2/022132
Document type
Peer-reviewed
Document version
Published version
Date of access to the full text
Language of document
en
Study field
Comittee
Date of acceptance
Defence
Result of defence
Document licence
Creative Commons Attribution 4.0 International
http://creativecommons.org/licenses/by/4.0/
Citace PRO