• čeština
    • English
    • русский
    • Deutsch
    • français
    • polski
    • українська
  • English 
    • čeština
    • English
    • русский
    • Deutsch
    • français
    • polski
    • українська
  • Login
View Item 
  •   Repository Home
  • Závěrečné práce
  • diplomové práce
  • Fakulta elektrotechniky a komunikačních technologií
  • 2011
  • View Item
  •   Repository Home
  • Závěrečné práce
  • diplomové práce
  • Fakulta elektrotechniky a komunikačních technologií
  • 2011
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Ustálený chod a zkratové poměry v síti 110 kV E.ON napájené z rozvodny 110 kV Čebín v roce 2011

Stabilized operation and short - circuit conditions within E.ON 110 kV power network supplied from Čebín 110kV switching station, during the period of 2011

Thumbnail
View/Open
review_39082.html (8.750Kb)
final-thesis.pdf (2.254Mb)
appendix-1.zip (701.8Kb)
Author
Chrástek, Radim
Advisor
Blažek, Vladimír
Referee
Janda, Petr
Grade
A
Altmetrics
Metadata
Show full item record
Abstract
Cílem této práce je navrhnout provoz tzv. můstkového zapojení v distribuční soustavě 110 kV v uzlové oblasti Čebín. Hlavním úkolem je kontrola splnění tolerancí napětí v rozvodnách 110 kV, kontrola zatížení transformátorů (400/110 kV, 110/VN kV) a vedení 110 kV, a kontrola zkratových odolností. Příslušné výpočty jsou provedeny s využitím dispečerského řídicího systému, který pracuje s aktuálními parametry všech zařízení distribuční soustavy. Teoretická část diplomové práce je věnována způsobu výpočtu ustáleného chodu sítě 110 kV a způsobu výpočtu zkratových poměrů. V praktické části je nejprve provedena analýza ustáleného chodu a zkratových poměrů DS 110 kV při současném provozu. V další části se věnujeme návrhu můstkového zapojení a analýze jeho provozu. Provoz můstkového zapojení je prověřen i při zvláštních stavech (poruchové stavy, zvýšené zatížení). Všechny vypočítané výsledky jsou zhodnoceny. Nejprve se věnujeme zhodnocení současného provozu a navrhovaného – můstkového zapojení. Dále provádíme zhodnocení provozu můstkového zapojení při zvláštních provozních stavech. Nakonec zhodnotíme ztráty v DS 110 kV. Pokud z výpočtů ustáleného chodu či zkratových poměrů DS 110 kV zjistíme, že některé její prvky jsou přetíženy, navrhneme změny, které zajistí bezpečný a spolehlivý provoz DS 110 kV.
 
The aim of this thesis is to project an operation of bridge connection in distribution network in Čebín’s nodal area. The main task is to check a fulfilment of voltage tolerance in distribution substations 110 kV, load transformer control (400/110 kV, 110/VN kV), distribution power line 110 kV control and short - circuit conditions control. Relevant calculations are performed by dispatching control system, which works with the actual parameters of all distribution network‘s 110 kV facilities. The theoretical part of this thesis is devoted to the way of the calculation of stabilized operation and the short-circuit conditions. In practical part, first we perform an analyse of stabilized operation and the short-circuit conditions of distribution network 110 kV in actual operation. Next step deals with bridge connection design and analysing its operation. The operation of bridge connection is verificated even in specific conditions (disturbance state, increased load). The next section evaluates the results of the calculations. First we deal with actual operations evaluation and proposed the bridge connection. In the next section we evaluate the operation of the bridge connection in the specific operating conditions. Finally, we evaluate the losses in the distribution network 110 kV. If the calculations of the stabilized operation or the short-circuit conditions of distribution network discovers that some of its elements are overloaded, we propose changes to ensure safe and reliable operation of the distribution network.
 
Keywords
Čebín, napěťové poměry, ustálený chod sítě, zkrat, zkratové poměry, Čebín, voltage tolerance, stabilized operation, short-circuit, short-circuit conditions.
Language
čeština (Czech)
Study brunch
Elektroenergetika
Composition of Committee
prof. Ing. Petr Toman, Ph.D. (předseda) prof. Ing. Karel Sokanský, CSc. (místopředseda) Ing. Jiří Holoubek (člen) Ing. Petr Skala, Ph.D. (člen) doc. Ing. Petr Baxant, Ph.D. (člen) doc. Ing. Vladimír Blažek, CSc. (člen) doc. Ing. Petr Mastný, Ph.D. (člen) doc. Ing. Antonín Matoušek, CSc. (člen)
Date of defence
2011-06-13
Process of defence
Student prezentoval svoji diplomovou práci a v diskuzi odpověděl na všechny položené otázky.
Result of the defence
práce byla úspěšně obhájena
Persistent identifier
http://hdl.handle.net/11012/7557
Source
CHRÁSTEK, R. Ustálený chod a zkratové poměry v síti 110 kV E.ON napájené z rozvodny 110 kV Čebín v roce 2011 [online]. Brno: Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií. 2011.
Collections
  • 2011 [551]
Citace PRO

Portal of libraries | Central library on Facebook
DSpace software copyright © 2002-2015  DuraSpace
Contact Us | Send Feedback | Theme by @mire NV
 

 

Browse

All of repositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

LoginRegister

Statistics

View Usage Statistics

Portal of libraries | Central library on Facebook
DSpace software copyright © 2002-2015  DuraSpace
Contact Us | Send Feedback | Theme by @mire NV