• čeština
    • English
  • English 
    • čeština
    • English
  • Login
View Item 
  •   Repository Home
  • Závěrečné práce
  • bakalářské práce
  • Fakulta stavební
  • 2013
  • View Item
  •   Repository Home
  • Závěrečné práce
  • bakalářské práce
  • Fakulta stavební
  • 2013
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Administrativní budova Brno Hlinky, řešení technologické etapy opláštění a zastřešení

Administrative building Brno Hlinky, implementation of facade and roof cladding

Thumbnail
View/Open
Posudek-Vedouci prace-13716.pdf (666.7Kb)
Posudek-Oponent prace-13717.pdf (576.7Kb)
appendix-1.zip (5.286Mb)
final-thesis.pdf (3.537Mb)
review_75404.html (1.476Kb)
Author
Dušková, Lucie
Advisor
Kovářová, Barbora
Referee
Liška, Pavel
Grade
A
Alternative metrics PlumX
http://hdl.handle.net/11012/29118
Altmetrics
http://hdl.handle.net/11012/29118
http://hdl.handle.net/11012/29118
Metadata
Show full item record
Abstract
Předmětem této bakalářské práce je řešení technologické etapy zastřešení a opláštění administrativní budovy v Brně na ulici Hlinky. Jedná se o dvou patrový objekt, částečně podsklepený, o celkových modulových rozměrech 9,4 x 37,5 m. Hlavní nosný skelet tvoří střešní vazníky a stropní průvlaky, které jsou připojeny ke sloupům. Střecha je vaznicová, nosnou vrstvu tvoří trapézový plech, který je uložen na horní příruby vaznic. Stěny jsou samonosné, vyzděné. Střešní plášť je zateplen vrstvou polystyrenu, hlavní hydroizolační vrstvu tvoří mPVC fólie. Převážná část opláštění je řešena kontaktním zateplovacím systémem s keramickým obkladem, část fasády na západní straně objektu je tvořena dřevěným obkladem se vzduchovou mezerou.
 
The subject of this Bachelor thesis is offering solution of technological steps roofing and cladding of an office building in Brno, Hlinky. It is a two storey building, partial basement, the overall module dimensions 9.4 x 37.5 m. Main supporting skeleton consists of roof trusses and ceiling beams that are attached to poles. The roof is purlin, load-bearing layer is trapezoidal sheet, which is on the top flange purlins. The walls are self-supporting, walled. Roof cladding is insulated with layer of polystyrene, the main waterproofing layer is mPVC film. Most of the cladding is designed as external thermal insulation composite systems with ceramic tiles, part of the facade on the west side of the building is made up of wood paneling with an air gap.
 
Keywords
vaznicová střecha, trapézový plech, minerální izolace, polystyren, kontaktní zateplovací systém, dřevěná fasáda, vzduchová mezera, Roof purlin, trapezoidal sheet, mineral wool, polystyrene, external thermal insulation composite system, wooden facade, air gap
Language
čeština (Czech)
Study brunch
Pozemní stavby
Composition of Committee
Date of defence
2013-06-12
Process of defence
Result of the defence
práce byla úspěšně obhájena
Persistent identifier
http://hdl.handle.net/11012/29118
Source
DUŠKOVÁ, L. Administrativní budova Brno Hlinky, řešení technologické etapy opláštění a zastřešení [online]. Brno: Vysoké učení technické v Brně. Fakulta stavební. 2013.
Collections
  • 2013 [832]
Citace PRO

Portal of libraries | Central library on Facebook
DSpace software copyright © 2002-2015  DuraSpace
Contact Us | Send Feedback | Theme by @mire NV
 

 

Browse

All of repositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

LoginRegister

Statistics

View Usage Statistics

Portal of libraries | Central library on Facebook
DSpace software copyright © 2002-2015  DuraSpace
Contact Us | Send Feedback | Theme by @mire NV