Laboratory testing of the communication based protection relays

Loading...
Thumbnail Image
Date
2015
ORCID
Advisor
Referee
Mark
Journal Title
Journal ISSN
Volume Title
Publisher
Vysoké učení technické v Brně, Fakulta elektrotechniky a komunikačních technologií
Abstract
The proper operation of control and protection applications in Substation Automation System (SAS) demands very high-speed and reliable communications that has being achieved by using IEC 61850. Moreover, the practical implementation and testing of protection scheme requires a communication system that can be conventional or high-speed peer-to-peer communication. This paper presents the evaluation of the performance advantage of GOOSE (Generic Object Oriented Substation Event) message over its conventional hard-wired counterpart for the same relays protection.
Description
Citation
Proceedings of the 21st Conference STUDENT EEICT 2015. s. 413-417. ISBN 978-80-214-5148-3
http://www.feec.vutbr.cz/EEICT/
Document type
Peer-reviewed
Document version
Published version
Date of access to the full text
Language of document
en
Study field
Comittee
Date of acceptance
Defence
Result of defence
Document licence
© Vysoké učení technické v Brně, Fakulta elektrotechniky a komunikačních technologií
DOI
Citace PRO