• čeština
    • English
    • русский
    • Deutsch
    • français
    • polski
    • українська
  • Deutsch 
    • čeština
    • English
    • русский
    • Deutsch
    • français
    • polski
    • українська
  • Einloggen
Dokumentanzeige 
  •   DSpace Startseite
  • Sborníky z konferencí
  • Fakulta stavební
  • Konference Juniorstav
  • Juniorstav 2022
  • Dokumentanzeige
  •   DSpace Startseite
  • Sborníky z konferencí
  • Fakulta stavební
  • Konference Juniorstav
  • Juniorstav 2022
  • Dokumentanzeige
JavaScript is disabled for your browser. Some features of this site may not work without it.

Agenda standardního specifického výzkumu FAST VUT v Brně

Agenda of Standard Specific Research Faculty of Civil Engineering Brno University of Technology

Thumbnail
Öffnen
S13P01_Doubek.pdf (1.781Mb)
Datum
2021-11-29
Autor
Doubek, Rostislav
Altmetrics
10.13164/juniorstav.2022.60
Metadata
Zur Langanzeige
Zusammenfassung
Cílem tohoto příspěvku je seznámit čtenáře s průběhem agendy standardního specifického výzkumu Fakulty stavební, Vysokého učení technického v Brně, a to od podání žádosti, přes průběh vlastního výzkumu až po věcné a administrativní naplnění požadavků výzkumu. Součástí řešení výzkumného projektu není pouze myšlenka a výzkumná část ale i související administrativní náležitosti, které mohou být v některých ohledech i náročnější než vlastní výzkum. Níže popsaný postup by měl začínajícímu vědeckému pracovního pomoci se snadněji zorientovat v problematice administrativních kroků a fází výzkumu, a tím propojení standardizovaných správních úkonů s vědeckým potenciálem.
 
The aim of this paper is to acquaint readers with the course of the standard specific research agenda of the Faculty of Civil Engineering, Brno University of Technology, from the application, through the course of their own research to the factual and administrative fulfillment of research requirements. The solution of the research project includes not only the idea and the research part, but also the related administrative requirements, which can be in some respects even more demanding than the research itself. The procedure described below should make it easier for the beginning scientific work assistance to orientate themselves in the issues of administrative steps and research phases, and thus link standardized administrative tasks with scientific potential.
 
Keywords
Specifický výzkum, administrativa projektu, výzkumná fáze, věžové jeřáby, financování projektu, Specific research, project administration, research phase, tower cranes, project financing
URI
http://hdl.handle.net/11012/203466
Document type
Peer reviewed
Document version
Final PDF
Source
Juniorstav 2022 – sborník příspěvků, s. 60-64. ISBN 978-80-86433-76-9.
DOI
10.13164/juniorstav.2022.60
Collections
  • Juniorstav 2022 [113]
Citace PRO

Portal of libraries | Central library on Facebook
DSpace software copyright © 2002-2015  DuraSpace
Kontakt | Feedback abschicken | Theme by @mire NV
 

 

Stöbern

Gesamter BestandBereiche & SammlungenErscheinungsdatumAutorenTitelnSchlagwortenDiese SammlungErscheinungsdatumAutorenTitelnSchlagworten

Mein Benutzerkonto

EinloggenRegistrieren

Statistik

Benutzungsstatistik

Portal of libraries | Central library on Facebook
DSpace software copyright © 2002-2015  DuraSpace
Kontakt | Feedback abschicken | Theme by @mire NV